HYDROELECTRIC POWER PLANTS

Merge Energy has prepared more than 150 feasibilities up to now and has followed the approval processes of them,
Merge Energy has made all the correspondences related to DSİ (State Hydraulic Works) and has granted the right to use water, licenses.

Duru I HEPP Project

5,29 MW

Amasya / Kozalan Stream

Duru II HEPP Project

5,40 MW

Amasya / Kozalan Stream

Duru I HEPP Gallery

Duru II HEPP Gallery

Duru HEPP Project consists of Duru-I and Duru-II HEPP Projects It is located on the Kozalan Stream, about 35 km from the Central District of Amasya province.

- License date started on March 2009 and is 49 years.
- The EIA report was received in 2010 and the construction started in 2010.
- Temporary admission of DURU - II Regulator and HEPP is on 25.02.2011,
- Temporary acceptance of DURU - I Regulator and HEPP was made by the General Directorate of Energy Works (EİGM) on 18.04.2013 and opened to operation.