PROJECTS

HYDROELECTRIC POWER PLANTS

Merge Energy has prepared more than 150 feasibilities up to now and has followed the approval processes of them,
Merge Energy has made all the correspondences related to DSİ (State Hydraulic Works) and has granted the right to use water, licenses.

  

Duru I-II HEPP Projects

10,69 MW

Projects of Prepared Feasibility Report

  • Ağabey HEPP
  • Ahmetçik HEPP
  • Akçay I Dam and HEPP
  • Akçay II Dam and HEPP
  • Akıncı HEPP
  • Akpınar I-II HEPP
  • Aksu HEPP
  • Arca HEPP
  • Armağan HEPP
  • Aserji HEPP
  • Aydınlık HEPP
  • Ayyıldız HEPP
  • Bahar HEPP
  • Balaban HEPP
  • Balamir HEPP
  • Balat HEPP
  • Barca HEPP
  • Başköy HEPP
  • Berat HEPP
  • Berk HEPP
  • Bey HEPP
  • Bulut HEPP
  • Çalkışla HEPP
  • Çamlıca HEPP
  • Çatköy HEPP
  • Çengelli HEPP
  • Çınar HEPP
  • Çiftlik HEPP
  • Çobanlı HEPP
  • Damla HEPP
  • Damlacık HEPP
  • Daran HEPP
  • Defne HEPP
  • Demirkapı HEPP
  • Derya HEPP
  • Dicle I HEPP
  • Dicle II HEPP
  • Dicle III HEPP
  • Durak Dam and HEPP
  • Duru HEPP
  • Egemen HEPP
  • Emet I-II HEPP
  • Enersis HEPP
  • Filiz HEPP
  • Garzan II HEPP
  • Garzan III HEPP
  • Garzan IV HEPP
  • Gök HEPP
  • Göktepe HEPP
  • Günder HEPP
  • Güneykaya HEPP
  • Havva HEPP
  • Hidronehir I HEPP
  • Hidronehir II HEPP
  • İncebel HEPP
  • İvme HEPP
  • Kale HEPP
  • Karataş HEPP
  • Karayel HEPP
  • Katırova HEPP
  • Kayabaşı HEPP
  • Kayabükü HEPP
  • Kayraktepe Dam and HEPP
  • Kazan HEPP
  • Kısmet HEPP
  • Kışla HEPP
  • Kor Dam and HEPP
  • Köroğlu HEPP
  • Kuşkonmaz HEPP
  • Kuzey I-II-III HEPP
  • Kuzey IV HEPP
  • Kuzey V HEPP
  • Kübra HEPP
  • Martı HEPP
  • Mercan II HEPP
  • Mert HEPP
  • Midilli HEPP
  • Mor I HEPP
  • Nazhan HEPP
  • Oltu HEPP
  • Olur HEPP
  • Osmancık HEPP
  • Özgüven HEPP
  • Poyraz I-II HEPP
  • Saran HEPP
  • Saray HEPP
  • Sarıbucak HEPP 

  • Sefaköy HEPP
  • Sema HEPP
  • Sena HEPP
  • Serap HEPP
  • Söğüt HEPP
  • Sude HEPP
  • Suluköy HEPP
  • Şahinkaya HEPP
  • Taşova HEPP
  • Taşyatak HEPP
  • Tavşanlı HEPP
  • Tekatan HEPP
  • Tor HEPP
  • Torul HEPP
  • Tuana HEPP
  • Umut HEPP
  • Umutlu HEPP
  • Ülkün HEPP
  • Yağmur HEPP
  • Yakacık HEPP
  • Yakut I HEPP
  • Yakut I-II HEPP
  • Yakut II HEPP
  • Yalnızca HEPP

Some of the application projects prepared by Merge Energy; (Construction, Mechanical and Electrical)

  • Duru I-II HEPP
  • Midilli HEPP
  • Yavuz HEPP
  • Hameka  HEPP
  • Umutlu HEPP
  • Yağmur HEPP
  • Tuana HEPP
  • Damla-Sude HEPP

Bilkent Plaza A3 Blok No: 19 Bilkent 06800 Çankaya ANKARA

+90 (312) 266 64 89

Design by ArtArda